C1001F00 to C1645300 Service processor checkpoints

The C1xx progress codes, or checkpoints, offer information about the initialization of both the service processor and the server. Service processor checkpoints are typical reference codes that occur during the initial program load (IPL) of the server.

Table 1 lists the progress codes that might be displayed during the power-on self-test (POST), along with suggested actions to take if the system hangs on the progress code. Only when you experience a hang condition should you take any of the actions described for a progress code.

In the following progress codes, x can be any number or letter.

Table 1. C1001F00 to C1645300 checkpoints
  • If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in the Action column until the problem is solved. If an action solves the problem, you can stop performing the remaining actions.
  • See Parts listing, type 7891 to determine which components are CRUs and which components are FRUs.
Progress code Description Action
C10010xx Pre-standby
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1001F00 Pre-standby:  starting initial transition file
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1001F0D Pre-standby:  discovery completed in initial transition file

While the blade server displays this checkpoint, the service processor reads the system vital product data (VPD). The service processor must complete reading the system VPD before the system displays the next progress code.

  1. Wait at least 15 minutes for this checkpoint to change before you decide that the system is hung.

    Reading the system VPD might take as long as 15 minutes on systems with maximum configurations or many disk drives.

  2. Go to Checkout procedure.
  3. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1001F0F Pre-standby:  waiting for standby synchronization from initial transition file
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1001FFF Pre-standby: completed initial transition file
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x01 Hardware object manager: (HOM):  the cancontinue flag is being cleared
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x02 Hardware object manager: (HOM):  erase HOM IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x04 Hardware object manager: (HOM):  build cards IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x08 Hardware object manager: (HOM):  build processors IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x0C Hardware object manager: (HOM):  build chips IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x10 Hardware object manager: (HOM):  initialize HOM
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x14 Hardware object manager: (HOM):  validate HOM
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x18 Hardware object manager: (HOM):  GARD in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x1C Hardware object manager: (HOM):  clock test in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x20 Frequency control IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x24 Asset protection IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x28 Memory configuration IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x2C Processor CFAM initialization in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x30 Processor self-synchronization in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009034 Processor mask attentions being initialized
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x38 Processor check ring IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x39 Processor L2 line delete in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x3A Load processor gptr IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x3C Processor ABIST step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x40 Processor LBIST step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x44 Processor array initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x46 Processor AVP initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x48 Processor flush IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x4C Processor wiretest IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x50 Processor long scan IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x54 Start processor clocks IPL step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x58 Processor SCOM initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x5C Processor interface alignment procedure in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x5E Processor AVP L2 test case in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x60 Processor random data test in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x64 Processor enable machine check test in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x66 Concurrent initialization in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x68 Processor fabric initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x6C Processor PSI initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x70 ASIC CFAM initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x74 ASIC mask attentions being set up
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x78 ASIC check rings being set up
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x7C ASIC ABIST test being run
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x80 ASIC LBIST test being run
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x82 ASIC RGC being reset
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x84 ASIC being flushed
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x88 ASIC long scan initialization in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x8C ASIC start clocks in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x90 Wire test in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x92 ASIC restore erepair in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x94 ASIC transmit/receive initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x98 ASIC wrap test in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x9C ASIC SCOM initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009x9E ASIC HSS set up in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xA0 ASIC onyx BIST in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xA4 ASIC interface alignment step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xA8 ASIC random data test in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xAC ASIC enable machine check step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xB0 ASIC I/O initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xB4 ASIC DRAM initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xB8 ASIC memory diagnostic step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xB9 PSI diagnostic step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xBB Restore L3 line delete step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xBD AVP memory test case in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xC0 Node interface alignment procedure in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xC4 Dump initialization step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xC8 Start PRD step in progress
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xCC Message passing waiting period has begun
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xD0 Message passing waiting period has begun
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1009xD4 Starting elastic interface calibration
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C103A1xx Hypervisor code modules are being transferred to system storage
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C103A2xx Hypervisor data areas are being built in system storage
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C103A3xx Hypervisor data structures are being transferred to system storage
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C103A400 Special purpose registers are loaded and instructions are started on the system processors
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C103A401 Instructions have been started on the system processors
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C116C2xx System power interface is listening for power fault events from SPCN.  The last byte (xx) will increment up from 00 to 1F every second while it waits.   
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C162E4xyy VPD is being collected; yy indicates the type of device from which VPD is being collected
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.
C1645300 Starting a data synchronization operation between the primary service processor and the secondary service processor.
  1. Go to Checkout procedure.
  2. Replace the system-board, as described in Replacing the FRU system-board and chassis assembly.


Notices | Terms of use | Privacy | Support