A flat panel monitor console kit typically occupies 1 U
or more of space in the Office Enablement Kit. Consider
installing the flat panel monitor console kit at the top of the mounting
space to make it easier to use the monitor, mouse, and keyboard.
Figure 1. Installing a monitor console
kit
Complete the following general steps to install a flat-panel
monitor console kit in the
Office Enablement Kit.
Note: For
specific installation instructions, see the documentation provided
with the flat-panel monitor console kit that you are installing.
-
Raise the flat-panel monitor to the full upright position.
-
Place the keyboard in the tray, removing the rubber pads
from the bottom of the keyboard, if necessary.
-
Route the keyboard-and-mouse cable through the cord clip
on the bottom, up through the opening on the right side of the tray,
and toward the cable management arm.
-
Attach the rails to the front and rear of the Office Enablement Kit, adjusting
the length of the rails to fit the depth of the rack cabinet. Use
the cage nuts that are provided with the flat-panel monitor console
kit.
-
Install the rail-alignment spacer.
-
Extend the inner part of the outer rails and slide the
ball-bearing assemblies forward to the front of the outer rails.
-
Slide the flat panel monitor and keyboard tray into the
ball-bearing assemblies in the rails.
-
Press the release latches and push the flat panel monitor
and keyboard tray completely into the rack.
-
Use the documentation provided with the flat-panel monitor
console kit to complete cable routing and the connection of the video,
keyboard, and mouse connectors.