To complete the installation,
you must install and close
the blade server cover, install the blade server into the BladeCenter® unit, and turn
on the blade server.
- Install
and close the blade server
cover. See Installing and closing the blade server cover.
Statement 21
CAUTION:
Hazardous energy is present when the blade
server is connected to the power source. Always replace the blade
server cover before installing the blade server.
- Install the blade server into the BladeCenter unit. See Installing the blade server in a BladeCenter unit.
- Turn on the blade
server, as described
in Turning on the blade server.
Note: If
you have just connected the power cords of the BladeCenter unit to electrical outlets,
you must wait until the power-on LED on the blade server flashes slowly
before you press the power-control button.
- If you installed an I/O expansion card, use the documentation
that comes with the expansion card to install device drivers and to
perform any configuration that the expansion card requires.
- For certain optional devices,
run the blade server SMS Utility program, as described in Using the SMS utility.